Project Overview
Installation Date: April 2024
Location: Southwest and Southeast facing roofs of house and garage
Technical specifications
System Size: 7.92kWp PV system with 40.5kWh battery storage
Panels: 17 x Jinko Solar 440W monocrystalline PV modules modules
Inverter: 17 Enphase IQ8 micro inverters
Battery Storage: 3 x 13.5kWh Tesla Powerwalls
Orientation: Southwest and Southeast facing, tilted at 37.5°
Connection: G99 single phase mains connection in the consumer unit with excess energy exported to the batteries before being exported back to the grid.
Expected Output: Approximately 5,890kWh of electricity per year
Environmental Impact: Annual savings of 1,204kg of CO2 emissions
Monitoring: Enphase and Tesla online monitoring enabling performance of both the PV and storage system to be monitored.